Slide Connection of the Llanos 34 block
to 100% renewable power supplies
The construction of a 37km, 115kV power transmission line
and the Tigana and Jacana substations guarantees the
supply of 68MW from the Chivor hydroelectric plant to
support the production of about 58,000 barrels of oil per day
– equivalent to 8% of total Colombian oil production – with
100% renewable hydroelectric power.
→ Learn more How our GHG Emission Reduction
Strategy is progressing
WATCH
Connection of Llanos 34 block
Slide See how we are progressing in the construction
of our Solar Photovoltaic Plant in the Llanos 34
block, which will soon be fully operational
→ Learn more Solar Photovoltaic Plant in
block Llanos 34